1. The longest method of conversion is

A. direct
B. parallel
C. phased
D. pilot
E. None of the above


Correct Answer: A. direct

2. Changes made periodically to a system, after its implementation, is known as system

A. analysis
B. design
C. development
D. maintenance
E. none of the above


Correct Answer: D. maintenance

3. The first step in the Systems Development Life Cycle is

A. database design
B. system design
C. preliminary investigation and analysis
D. graphical user interface
E. None of the above


Correct Answer: C. preliminary investigation and analysis

4. Nassi – Schneiderman charts

A. are being replaced by flowcharts
B. often describe overlapping control structures
C. are made up of boxes within boxes
D. both (a) and (c)
E. None of the above


Correct Answer: C. are made up of boxes within boxes

5. Which of the following tools is not used in modeling the new system?

A. decision tables
B. data dictionary
C. data-flow diagrams
D. All of the above
E. None of the above


Correct Answer: D. All of the above