41. Which of the following is not a key component of the evaluation process in building a DSS?

A. criteria for evaluation
B. means of measuring system-development time spent on the project
C. means of monitoring the progress of the DSS
D. formal review process
E. All of the above are key components


Correct Answer: B. means of measuring system-development time spent on the project

42. If you are an information-system manager, which organization is most appropriate for your interest?

A. ACM
B. SIM
C. ASA
D. IEEE
E. None of the above


Correct Answer: B. SIM

43. The four major corporate resources are money, materials, information, and

A. people
B. icons
C. information system
D. on-line
E. None of the above


Correct Answer: A. people

44. An optional facilitates location program can be used to study

A. factory location alternative
B. warehouse location alternatives
C. plant location alternatives
D. All of the above
E. None of the above


Correct Answer: D. All of the above

45. A standards manual specifies standards that are to be followed in

A. system design
B. system operation
C. both (a) and (b)
D. neither (a) nor (b)
E. None of the above


Correct Answer: C. both (a) and (b)

Comments

No comments yet. Why don’t you start the discussion?

    Leave a Reply

    Your email address will not be published. Required fields are marked *

    four × 5 =